A Guide to Sizing a Diesel Generator

Note: Diesel Generator applications can be quite complex, involving many different site specific elements to be considered. This article presents a basic guide to sizing a diesel generator. It assumes basic knowledge of power calculations.

Diesel Generator sizing involves calculating the following load factors:

1. The continuous load operating at any given time

2. Derating factors

3. Transient performance

4. Non Linear loads

The size required will be determined by the maximum demand from one of the above load factors. We will now expand on each one.

1. TOTAL CONTINUOUS LOAD (run kVA)

· Calculate the total kVA for all motors and machinery that will be operating at one time

· Calculate the total kVA for all heating / air conditioning that will be operating at one time

· Calculate the total kVA for all lighting that will be operating at one time

The run kVA (rkVA) equals the sum of the maximum possible load demand at one time.

2. ALLOW FOR ANY DE -ATES

Common de-rate elements are:

· Altitude

· Ambient temperature

· Dust

· Humidity

· Power Factor

Each diesel generator will have their own de-rate characteristics to each item, since their technical data must be referred to. If more than one de-rate applies the multipliers become cumulative.

When de-rates apply the continuous rating of the generator is reduced by the multiplier.

3. TRANSIENT LOAD PEFORMANCE

When a motor starts its initial kVA (start kVA) is larger than its run kVA. This occurs due to initial inrush current required to start the motor. The skVA can be several times the rkVA causing an initial larger load demand and resulting voltage voltage at the terminals. In general, a voltage dip greater than 25% can cause the generator to stall / shutdown, since becoming an important element to consider. Generators have specific starting voltage characteristics that must be considered.

Various starting methods are used in applications to reduce the skVA.Each will have their own performance characteristics and will provide their starting impact. Technical data can be obtained from the manufacturers.

Motors that come on line at various stages, calculations are based on the highest possible demand scenario. When there is more than one motor starting simultaneously the total skVA is the sum of each of the motors skVA

4. NON LINAEAR LOADS

Non-linear loads (NLL) are defined as electrical equipment that draw non sinusoidal current from the supply source (diesel generator) causing harmonics in the current waveform, which in turn causes distortion in the voltage waveform. Current distortion (ID) is a function of the number pulses. The degree of distortion can cause instability in the loads control system and generators excitation system.

For a diesel generator to be able to limit the voltage distortion (VD) the alternator must have a sub-transient reaction (X "d) at a level (lower the better) that allows for this.

There are several guide / charts that take input of ID% and acceptable VD% and provide the X "d that must not be exceeded.

The diesel generator selected must have an alternator that operates within the X "d limit. For applications where the NLL is a high percentage of the total load an oversized alternator may be required.

DIESEL GENERATOR SIZE

Once the maximum kVA for each of the load factors are determined the size of the diesel generator will be that of the highest demand and hence meeting demands of remaining load factors.

As it can be seen sizing a diesel generator can be quite complex. This guide is basic and was written to provide awareness to the considerations required when sizing a generator. This discussion can be expanded into great detail, in which consideration may be required to provide the correct sizing of the diesel generator.









0 comments

  • Credit Cards Conditions And Terms So it is advisable and wise for you to compare its fees and terms before you make your mind to get start with a charge or credit card account. There are some conditions and terms to consider which usually must be disclosed in charge card…
  • Broadening Business Horizons Journey from offices to home pc With e-commerce on the rise, forthcoming e-business trends are changing each day. New heights are achieved day by day. From bringing people from different locales closer, shortening the horizon into the palm of…
  • 3 Tips for Achieving Financial Freedom Let me start off by saying that we live in a very distracted world currently, where consumerism is king. Just what is consumerism? It's the thought or idea passed on my companies and marketers that we need every new gadget, gizmo or even…
  • The Second Ubantu Smartphone Has Rolled Out Introduction Noted mobile company Canonical has roled out its second Ubantu-based Smartphone this year after teaming up with Spain-based BQ. The two companies came out with the first Ubantu-based mobile in the recent past with the view of…
  • Get Help With Managed Debt Solutions You are in debt and are getting desperate? There are ways to get out of these toils, and it is a good idea, before you start, to think well about how you got to where you are now. This is very important. Write down the choices you made, keep…